Skip to main content

Removal of Pump

2/2/24

Mid-morning on Monday 2/5 Ramey Environmental will be removing the dewatering pump from the corner of Twin Bridge Drive and Long Drive using a crane and loading it onto a flatbed truck. It is not expected to block any roads.  

The dewatering pump is being removed for repair.

Join our mailing list